ADR-0049: Idle→Speculative release — per-CapacityType idle holds inside Phase 3; the hold window is the rail, not a cap

Status

Accepted, 2026-06-13. Engine scope — M73 (plan §12): paper §8’s release half, the reason fleet spend previously only ratcheted upward. A separate ADR rather than an ADR-0046 addendum on purpose: ADR-0046’s rails live at the actuation boundary and “can never change what the engine wants, only how fast it gets it” — the release walk changes exactly what the engine wants, lives in pkg/decision, and ADR-0046’s own “explicitly NOT built” list already names the M73 release path as the owner of acquisition/spend, not the rails.

Context

Paper §8, verbatim: “Phase 3: reclaim excess. Reclaimed → Idle. Idle → Speculative lazily per provider (bare metal: forever; on-demand: minutes; spot: ~1m).” Until M73 only the first half existed — machines entered Idle (reclaim completion, Configuring rollback, seed/reconcile discovery) and never left. provider.Delete was on the wire with M71 fencing and conformance idempotency coverage, and had zero engine callers.

Sequencing was deliberate: plan §12 gated M73 on M67/M68. Under ADR-0045’s single attribution an Idle machine is bound to no cluster and counts for nothing — releasing it can never take capacity from anyone. A Delete path on the pre-ADR-0045 mis-attributing engine (where Phase 1 could provision what Phase 3 reclaimed in the same cycle) would have been a Create↔Delete money loop; on the unified engine the loop is impossible by construction (below).

Decision

Release lives inside Phase 3

Phase 3 is the excess-disposal site: it already consumes the cycle’s claimed-set (ADR-0045) and owns every unclaimed machine. The release walk is the same diff one lifecycle state earlier — unclaimed Configured in excess of demand → Reclaim (shrinkage); unclaimed Idle past its hold → Delete (Reason: "phase3.release"). A fourth phase would re-plumb the same snapshot and claimed-set for no isolation gain; the addition is ~30 lines on a ~106-line phase.

A Delete is emitted for an Idle machine iff:

  1. it is not in this cycle’s claimed-set — a claimed Idle machine is the one Phase 1 is about to bootstrap and must not be deleted out from under that commitment (same shield Phase 3’s reclaim walk uses, same single attribution); and
  2. its CapacityType hold has expired, measured from the inventory’s idle-since stamp against the cycle’s now.

The ADR-0036 first-rollup gate deliberately does not apply to releases: that gate exists because an unreported cluster’s empty NeedsTable is “unknown demand”, and reclaiming bound capacity on it would kill workloads. An Idle machine belongs to no cluster, so there is no per-cluster signal to gate on, and the worst case of a wrong release is one re-buy. The restart window is instead covered by the clock-reset semantics below: nothing releases until a full hold has elapsed under the fresh process, which is dozens of cycles and many roll-up intervals for demand to arrive and claim.

Per-CapacityType holds, constants not configuration

decision.DefaultReleasePolicy(), paper §8 numbers as named constants (pkg/decision/release.go):

TierHoldWhy
Bare metalforever§8 verbatim. Owned hardware; Delete is provider-rejected anyway (§7 ErrNotSupported).
ReservedforeverThe commitment is paid whether the machine exists or not (paper §4 — fixed capacity’s marginal cost is zero); releasing saves nothing and risks the slot.
UnspecifiedforeverNever delete capacity whose cost class is unknown.
On-demand10 minutes§8’s “minutes”. The trade is asymmetric and cheap both ways: a wrong release costs one Create + bootstrap latency (no money — cloud Creates are free, the hourly bill stops); a wrong hold costs the hourly price for the window (~1/6 machine-hour). 10m rides out the common short demand dips (rolling restarts, redeploys — the timescale ReclaimGrace already budgets for the drain that precedes this hold) without ever holding a full billing hour of pure waste.
Spot1 minute§8’s “~1m”, verbatim. Idle spot is paid-for capacity the provider can interrupt anyway, and spot-priced workloads tolerate provisioning latency by construction — the cheapest possible re-buy.

ADR-0042-Addendum posture: tunables stay constants until evidence demands otherwise. There is no flag and no chart value. The one override surface is the library field shard.Config.ReleasePolicy (nil → the defaults), which exists so the sim can pass short holds — sim cycles ≈ time, and the paper constants would never expire inside a milliseconds-long closed-loop run. The zero-value policy releases nothing (“zero value = historical behaviour”, the repo convention).

Idle-since tracking: inventory sidecar, in-memory, no wire fields

M66.1 deleted per-machine transition timestamps as unread; this is the first consumer that earns one back — and it comes back as a sidecar map inside pkg/inventory (idleSince), not a Machine field and not a proto field. Inventory is the single honest stamping point: every entry into Idle — drain completion, Configuring rollback, seed, reconcile discovery — flows through Insert/Apply, so one chokepoint stamps them all; a same-state Idle→Idle Apply (reconcile field merge) preserves the original stamp. The snapshot carries a copy (O(#idle)) so the release walk reads a view consistent with the rest of the cycle.

Restart semantics, exactly: the map is process-local. A restarted shard rebuilds inventory from provider.List and stamps every Idle machine at discovery time, so after a restart machines hold longer than policy, never shorter. The failure mode of a lost clock is a delayed release — a few extra machine-minutes of spend — never a premature delete. Conservative in the safe direction; persistence would buy precision nobody needs at the cost of a new durable state surface (YAGNI; the audit would flag a wire field for the same reason).

Execute path

executeDelete walks Idle → Deleting → Speculative — the sanctioned §5 transition, StateDeleting existed unused since M2 — via provider.Delete. The M71 fencing fields ride the wire exactly as for the other mutating RPCs (the grpcclient stamps them itself). Idempotent on retry: a machine already past Idle is a no-op, and the fake/conformance contract reuses the operation_id mid-Deleting. On reaching Speculative the host ref is cleared (§7: Delete releases the machine entirely; the ID survives as a quota slot). A provider error — including ErrNotSupported — marks the machine Failed: the policy never emits Delete for fixed tiers, so a rejection means the provider’s CapacityType declaration and its Delete support disagree, which is a contract violation worth surfacing, not retrying.

Every disposition is observable like any other kind: audit log records kind=Delete (ADR-0046 addendum), bigfleet_shard_actions_total{kind="Delete"} counts emissions, and bigfleet_shard_idle_releases_total counts completed releases (rate() over the cycle cadence ≈ releases per cycle). The kill switch, dry-run mode, and MaxActionsPerCycle apply unchanged — Delete flows through the same suppression points as every kind.

The rail question: no release cap; the hold window is the rail

ADR-0046’s rail 1 caps reclaims because a wrong Reclaim kills workloads once grace runs out. That reasoning does not transfer:

  • Zero workload blast radius by construction. A Delete touches only machines that are unbound by state invariant (Idle ⇒ cluster="") and unclaimed by the cycle’s single attribution. ADR-0045’s model is the load-bearing fact: an Idle machine counts for nothing, so releasing it can never take capacity from anyone.
  • The money failure is not the Delete — it’s a release/re-buy loop, and the loop cannot close. Each executed Delete stops an hourly bill. For a release to cost anything, the machine must be re-bought, and Phase 1 acquires only on deficit (bound < demand). A deficit that exists at any point during the hold window claims the idle machine into the claimed-set and shields it — so a released machine was surplus to all demand for its entire hold. If demand arrives after release, the re-buy happens once and produces a bound machine, which cannot be re-released without a fresh demand shrink followed by another full unclaimed hold window. Worst-case churn under adversarial demand flapping is therefore one Create per machine per hold period — and that bound is exactly the per-tier knob §8’s numbers tune (spot flaps cheap by design; on-demand gets ten minutes of hysteresis).
  • A cap would slow the only thing M73 exists to do — stop paying for surplus after a genuine scale-down — while protecting nothing the hold doesn’t already protect. The human backstops are already in place: rail 3 (kill switch) and dry-run suppress Delete like every other kind.

The loop impossibility is pinned in sim (sim/m73_release_test.go): TestClosedLoop_IdleRelease_SurplusReleasedOnce_LoopCannotClose — a steady-demand fleet with surplus elastic idle releases it exactly once and acquires nothing over the whole run — and TestClosedLoop_IdleRelease_ShrinkageThenHoldExpiry_NoRebuyLoop — the full §8 arc: the burst absorbs bare-metal idle then buys elastic, demand shrinks, reclaim → Idle → hold expiry → Delete for the elastic tier only (the reclaimed bare-metal remainder idles forever), then quiet with zero re-acquisition. The steady-state and supply-exhaustion canaries hold unchanged (their idle tiers are bare metal, and the paper holds never expire inside sim wall-clock anyway).

What is explicitly NOT built

  • A per-cycle release cap — above.
  • Persistence or wire fields for idle-since — restart semantics section; conservative direction is free.
  • Configurable holds (flag/chart) — constants until evidence.
  • Release for fixed tiers — the policy type cannot express it; no configuration mistake can delete owned hardware.
  • Operator notification on Delete — the machine is unbound; there is no UpcomingNode and no cluster to notify. NodeStateUpdates for it stopped at the Draining→Idle transition that preceded the hold.
  • Coordinator involvement — shard-local end to end; static stability untouched.

Conformance

M71 already covered Delete idempotency, fencing, and NotFound; M73 adds the lifecycle-position check TestConformance_DeleteOnConfigured — Delete on a Configured machine must fail (the §5 state machine has no Configured→Deleting edge; a bound machine must be drained first), with any code except FAILED_PRECONDITION (reserved for fencing) and Unimplemented allowed for bare-metal-style providers. “Delete on Idle succeeds” was already pinned by the full-lifecycle test.

References

  • Paper §7 (Delete semantics; the M71 DeleteRequest blockquote), §8 (the release rule, verbatim).
  • ADR-0036 — why reclaim is gated per cluster and release is not.
  • ADR-0042 Addendum — the constants-not-config posture.
  • ADR-0045 — Idle counts for nothing; the single attribution both walks share.
  • ADR-0046 — the rails this ADR deliberately does not extend.
  • plan §12, M73 row and its M67/M68 dependency note.